Transport infrastructure
Study

Křižovnická—Smetana Embankment—Masaryk Embankment

Project name:
Conceptual Study: Křižovnická—Smetana Embankment—Masaryk Embankment
Location:
Praha 1 – Staré Město
Praha 1 – Nové Město
Smetanovo nábřeží
Architect:
Prague Institute of Planning and Development
Investor:
Capital City of Prague, Technická správa komunikací hl. m. Prahy, a.s.
Author:
Jiráček Šimon, Benedikt Vojtěch
Co-author:
Zuzula Jakub
Associates:
Hora David, Božovský Jan, Vybíral Jan, Jeřábek Pavel, Zapletal Rostislav
Engineer:
Sinpps s.r.o.
Typology:
Transport infrastructure, Public space
Status:
Study
Project start:
2020 Q3
Project completion:
N/A
Total investment:
CZK 65 million
Updated:
12/11/2025
Sources:
iprpraha.cz

Visualization of the architectural design—Křižovnická Street, Staroměstská stop

Source: IPR Praha

Visualization of the architectural design—Křižovnická Street, Klementinum

Source: IPR Praha

Photo of the current condition—Smetana Embankment, Karlovy Lázně stop

Source: IPR Praha

Visualization of the architectural design—Masaryk Embankment, National Theater Stop

Source: IPR Praha

Photo of the current condition—Smetana Embankment, Park of NaNationalwakening

Source: IPR Praha
01/05

Visualization of the architectural design—Křižovnická Street, Staroměstská stop

Source: IPR Praha

Křižovnická Street, Smetana Embankment, and Masaryk Embankment are public spaces that are currently not living up to their potential. The area is burdened by a high volume of private transit traffic, the intensity of which requires a separate corridor to prevent disruptions to public transportation. A potential reduction in traffic volume would allow for the consolidation of public and private traffic into a single lane. The space created in this way could be used for a promenade, outdoor seating areas, new tree-lined avenues, delivery zones, or a bike path so that cyclists do not have to ride on the sidewalk. It is precisely in these areas that untapped potential lies. With regard to air quality, it must be noted that the waterfront area around Křižovnické Square is the most unhealthy area in the Old Town due to high concentrations of PM10 particles. Phase 1 was completed in 2022; preparations for Phase 2 are currently underway, and it is expected to be completed by the end of 2026.

Is there a project missing or have you found outdated, incomplete or incorrect information in the existing ones?

Let us know using the form 🙏