Transport infrastructure
Completed structure

Dvorecký Bridge Tram Line

Location:
Praha 4 – Podolí
Praha 5 – Hlubočepy
Podolské nábřeží
Na Zlíchově
Investor:
Prague Public Transit Company, joint-stock company
Typology:
Transport infrastructure
Status:
Completed structure
Project start:
2022
Project completion:
2026 Q1
Total investment:
CZK 1,45 billion
Updated:
11/11/2025
Sources:
pid.cz

Fotografie dokončené tramvajové tratě

Source: pid.cz

Fotografie dokončené tramvajové tratě

Source: pid.cz

Fotografie dokončené tramvajové tratě

Source: pid.cz

Transport map of the Dvorecký Bridge Tram Line

Author: ROPID

Diagram of changes to bus routes

Author: ROPID
01/05

Fotografie dokončené tramvajové tratě

Source: pid.cz

The construction of the Dvorecký Bridge will include a new tram line measuring 361.4 meters. Construction of the line began in September 2022, with a total cost of CZK 1.45 billion. The line is scheduled to open in March 2026.

The tram line will provide two new main connections. Line 20 will run from Modřany and Braník via Smíchovské nádraží and on to Anděl, Malá Strana, and Dejvice. Line 21 will run from Barrandov to Podolí and on to Vinohrady.

As part of the construction of the new tram line, additional tram route adjustments will be made. Line 15 will replace Line 20 on the route to Barrandov. In Kotlářka, line 7 will replace line 15, and in Radlice, line 4—which will now operate all day—will provide a connection to the city center.

On Line 2, the long-awaited trams will finally appear on weekdays, though they will now continue from Charles Square to Nusle. Line 14 will temporarily leave the Prague tram network so that it can reappear in a completely new form after the opening of another major connection: the tram line on Wenceslas Square.

Pražská integrovaná doprava

Is there a project missing or have you found outdated, incomplete or incorrect information in the existing ones?

Let us know using the form 🙏